Laserfiche WebLink
' CRO <br /> Ms Mary Meays <br /> March 8, 1995 (94-47-8620) <br /> RECOVERY WELL INSTALLATION <br /> Following backfilling and proper compaction (see original Soil Management Plan), Fugro <br /> proposes to install a six-inch diameter, approximately 30-foot deep recovery well (RW-IA) in the <br /> center of the former UST excavation (Figure 1) The well will be constructed to accommodate <br /> both groundwater and vapor extraction It will be screened from approximately 30- to 10-feet <br /> bg Standard well construction procedures, as presented in the S3CPHS/EHD Well Standards, <br /> will be followed A grout inspection will be scheduled 48 hours ahead of time <br /> • <br /> 94478620 BAD -3 - <br />