Laserfiche WebLink
FUGRO WEST, INC. <br /> 1050 Melody Lane suite 160 <br /> Roseville California 95678 <br /> Tel (916)782-2110 <br /> FAX (916)786-7830 <br /> October 17, 1995 <br /> Project No 9447-8620 <br /> Mr Jeff Granberry <br /> Shell Oil Products Company <br /> Post Office Box 4023 <br /> Concord, California 94524 <br /> Subject Tlurd Quarter 1995 Ground Water Monitoring Report <br /> Shell Service Station (WIC No 204-7524-3505) <br /> 2575 Country Club Boulevard, Stockton, California <br /> Dear Mr Granberry <br /> This report documents the results of Quarterly ground water monitoring conducted on <br /> July 27, 1995 at the subject site by Blaine Tech Services, Inc of San Jose, California <br /> Separate-phase hydrocarbons were measured at a thickness of 0 08 feet in wells RW-lA \ <br /> and MW-5 by Blaine Tech Services, Inc , on July 27, 1995 Depth to water measurements in <br /> wells RW-lA and MW-5 were made by Fugro West, Inc personnel on September 12, 1995 <br /> Separate-phase hydrocarbons were not measured in either well However, a passive skimmer was <br /> installed in well RW-lA <br /> The interpretations and/or conclusions that may be contained within the attachments <br /> represent our professional opinions These opinions are based on currently available information <br /> and were developed in accordance Agth accepted geologic, hydrogeologic, and engineering <br /> practices at this time and for this specific site No warranty is implied or intended <br /> This report has been prepared solely for the use of Shell Oil Products Company Any <br /> reliance on this report by third parties shall be at such parties' sole risk This report was prepared <br /> under the review and supervision of a professional engineer registered with the State of <br /> California, whose signature appears below <br /> • <br /> 9447-8620-3 QMR <br /> ___ A mamhwr_of tha Ftigro q[otip.a .comnaniae wdtLpftpS-thmugh0LLtIR�V a <br />