My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003533
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2900 - Site Mitigation Program
>
PR0541989
>
ARCHIVED REPORTS XR0003533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 8:29:56 PM
Creation date
6/21/2019 3:56:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003533
RECORD_ID
PR0541989
PE
2950
FACILITY_ID
FA0024100
FACILITY_NAME
COUNTRY CLUB VALERO
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12302012
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
USED <br /> Jeff Granberry <br /> September 26, 1995 ( 9447-8620) <br /> 5.0 CONCLUSIONS <br /> Approximately 2,090 yd' of soil were excavated from the former UST, piping, dispenser <br /> overexcavatlon and from the new UST excavation The soil was transported to Forward Landfill <br /> for proper disposal A new double-walled fuel dispensing and storage system has been installed <br /> at the site The former tank pit was backfilled with soil excavated from the new tank basin <br /> Access to and excavation of soil within the former tank pit was limited by caving of the <br /> sxdewalls, and the close proximity to the station building, dispenser island canopy, and property <br /> boundaries The former tank pit was vertically excavated at one sampling location to a total <br /> depth of 24 feet below site grade, the maximum extendable depth of the backhoe <br /> Mitigation measures performed at the site consisted of separate phase petroleum <br /> hydrocarbon recovery, soil vapor extraction, and soil excavation/disposal To date, approximately <br /> 3,826 gallons of petroleum hydrocarbons have been removed from the site using various remedial <br /> measures <br /> i <br /> 94478620 ARP - 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.