Laserfiche WebLink
i s <br /> 0 CAMBRlA <br /> ADDITIONAL ACTIVITIES <br /> On April 19, 2002,Cambria submitted a Discharge Status Report to the City of Stockton in order <br /> to document the MTBE discharge that had occurred from the GWE system as well as <br /> correspondences and actions taken to address the situation <br /> On June 6, 2002, Cambria re-submitted a Wastewater Discharge Permit Application to the City of <br /> Stockton according to the request made in their May 1,2002 letter to Cambria <br /> ANTICIPATED FUTURE ACTIVITIES <br /> Cambria will continue routine site visits to perform operation and maintenance activities and collect <br /> samples from the GWE system Cambria will also prepare the second semi-annual 2002 self- <br /> monitoring report <br /> CLOSING <br /> "I certify under penalty of law this document and all attachments were prepared under my direction <br /> or supervision in accordance with a system designed to assure qualified personnel properly gather and <br /> evaluate the information submitted Based on my inquiry of the persons directly responsible for <br /> gathering the information,the information submitted is,to the best of my knowledge and belief,true, <br /> accurate,and complete I am aware there are significant penalties for submitting false information, <br /> including the possibility of fine and imprisonment for knowing violations" <br /> Thank you for your assistance with this project Please call Cynthia Vasko at(707)933-2370 if you <br /> have any questions <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Cynthia Vasko <br /> Staff Engineer <br /> Joe W Neely <br /> Project Manager <br /> i <br /> 0783 3 <br />