Laserfiche WebLink
,* CAMBRIA <br /> CLOSING <br /> As per agreement with the SJCPHS/EHD (September 21, 2001 telephone conversation), Cambria <br /> is implementing the previously proposed sampling program change In summary, the five offsite <br /> domestic wells will be sampled annually for MTBE only The bailer samples from the Boardman <br /> well and the Sannella well will be discontinued These two wells will be sampled from the <br /> sample port at the well head The three deep monitoring wells (MW-12, MW-13, and MW-14) <br /> will continue to be sampled quarterly, but only analyzed for MTBE The Caltrans well will <br /> continue to be sampled quarterly <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> V <br /> Cynthia Vasko <br /> Staff Engineer <br /> A4 � ,�EQ GE <br /> ��� �QH W H�cF0. <br /> Joe W Neely, RG <br /> Senior Project Geologist <br /> RG 6927 0 No 6927 <br /> SOF CALIF <br /> 0783 3 <br />