Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> Project # -11 Client- c, a <br /> Sampler: p � Start Date- -11-o j <br /> Well I D fit , . Well Diameter: 3 4 6 8 <br /> Total=Well=Depth. y d Depth to Water 6_ <br /> Before After Before After <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to- Pvc Grade iD O. Meter (If req'd) YS] HACH <br /> Purge Method Sampling Method_ Bailer <br /> Bailer Waterra Disposable Bader <br /> Disposable Bailer Peristaltic Extraction Port <br /> ✓Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other <br /> Well Dtame#er Multi icer Well Diameter Multiplier <br /> F" 004 4' 065 <br /> I (Gals)X 3 — ✓' Gals Y 0 16 6" 1 47 <br /> 3" 037 Other radiusz"0 }63 <br /> 1 Case Volume Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond Turbidity Gals Removed Observation <br /> Did well dewater? Yes Gallons actually evacuated 1-. 5— <br /> Sampling <br /> S`Sampling Time- /tea Sampling Date <br /> Sample I D w_ Laboratory <br /> Analyzed for. H-G BTE MTB TPH-D Other <br /> Equipment Blank I D @ Time Duplicate I D <br /> Analyzed for- TPH-G BTEX MTBE TPH-D Other <br /> D O (If req'd) Pre-purge ` g/L Post-purge */L <br /> ORP (if req'd) Pre-purge mV Post-purge m� <br /> Maine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />