Laserfiche WebLink
SHELL WELL MONITORING DATA SHEET <br /> Project #: q 0! -Z7-- T ( WIC #: -2a Lf_ s2 4j� 3 SO=S` <br /> Sampler: s' -t, Date: I / Z 7 At <br /> Well I.D.: H-,i rn ; Well Diameter: 2 3 4 6 8 <br /> Total Well Depth: Depth to Water: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: PVC Grade D.0. Meter (if req'd): YSl HACH <br /> Well DiaMete muitipjjgl Well Diameter Multi2lier <br /> 2" 0.16 5" 1.02 <br /> 3" 0.37 6- 1.47 <br /> 4" 0.65 Other radius".0.163 <br /> Purge Method: Bailer Sampling Method: Bailer <br /> t Middleburg x coon Parc <br /> Electric S u ible Other: <br /> xtraction Pu11, <br /> mp <br /> Other. <br /> X = Gals. <br /> 1 C_.e Volume;Gals.; Specked Volumes Calculated Volume <br /> Time Temp (°F) pH Cond. Turbidity Ga.is. Removed Observations <br /> Gr 1 54 pit <br /> Did well dewater? Yesr--__N_o7' Gallons actually evacuated: <br /> Sampling Time: ^� Sampling Date: 7 7/`/� <br /> Sample Z.D.: ZyS Laboratory: (��Sequoia Crosby <br /> Analyzed for: -�TEXF_ TPH-D Other: G' Gi 6 7 e-C; G21 F <br /> Equipment Blank I.D.: Tia Duplicate I.D.: <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: <br /> D.O. (if req'd): Pre-purge: 'r'g/ Post-purge: 'r'&I <br />