Laserfiche WebLink
SHELL WELL MONITORING DATA SHEET <br /> Project #: WIC #: 2 o q_ 75-tLj — 3 Sa <br /> Sampler: } �, Date: (0/(/f 8 <br /> WeII I.D.: m !Z- Well Diameter: 2 3 4 6 S <br /> Total-Wdll-Depth: S*6=1 Depdrto Water: 1=8.Z k <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Eyc ' Grade D.Q. Meter (if req'd): Ysl HACH <br /> WellDiamaer Muit1011yi Well Diameter Muln21ier <br /> 2" 0.16 5' 102 <br /> 3" 0.37 6" 147 <br /> 4" 065 Other radtus2.0163 <br /> Purge Method. Bailer Sampling Method. Bailer X <br /> D&ddleburg Extraction Port <br /> Electric Submersible�( Other <br /> Extraction Pump <br /> Other <br /> q7, 7 x 3 Gals <br /> 1 Case Volume(Gals} Specified Volumes Calculatea Volume <br /> Tune Temp (°F) pH Cond. Turbidity Gals Removed Observations <br /> /Vql 71-.6 (-1 lgo() z 1 9�, o <br /> 1`ft17 7z �_9 t3C)0 19 0 <br /> Did well dewater? Yes No Gallons actually evacuated: Z� <br /> Sampling Time: IL/M SamplingDate- (o A/1�0 <br /> Sample I.D.: Wluf-13,., Laboratory: CER <br /> Crosby <br /> Analyzed for: - TPH-D Other- Q K h 007-6o , M e404•.. <br /> Equipment Blank I.D.: @ ,. Duplicate I.D.: <br /> Analyzed for: TPH-G B= MTBE TPH-D Other• <br /> D O. (if req'd): Pre-purge / Post-purge- i°'g/ <br />