Laserfiche WebLink
i <br /> SHELL WELL MONITORING DATA SHEET <br /> Project #: 4�o7z9-s 1WIC #: 2� <br /> wr— <br /> Sampler: DoV& -F 5-f-cyt, Date: -7- 29- 18 <br /> Well LD.: Mw -3) Well Diameter. 2 3 4 6 8 <br /> Total Weil Depth: V5.5 1 Depth to Water: $ .1'7 <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: PVC Grade D.O. Meter (if req'd): Y5I x�.Cx <br /> Wel Dam multmilQ Wc11 Dtam ez ul=Etr <br /> r 0.16 S' 14z <br /> 3" 037 6 147 <br /> 4' 0.65 otb= radius=•0 163 <br /> Purge Method Bailer Samnhng Method: dLir <br /> MiddIeburg an-action Port <br /> Elecme Subme Other- <br /> Eatmction Pump <br /> Other: <br /> 10A X 3 z� 9 Gals <br /> i Case Volume(Gals) Specified Volumes Calculated Volume <br /> Time Temp {°F) pH ConcL I Turbidly Gals Removed Observanons <br /> q5- -70.5- -7. 7— 185z �{$. 10• <br /> N7 70. 4 -7. 3 161n I 132•-� I `0 o <br /> qy9 -70.Z ~7.7 1710 1 1 q. q 30.0 <br /> Did well dewater? Yes No Gallons actually evacuated: 0.p <br /> Sampling Time: 1SZ Sampling Date: -7- Z9--`79 l <br /> Sample T.D.: !MW — 3 Laboratory- se ola Crosby <br /> Analyzed for. H G TEX Z�UE) TPH-D then. pxjtwJe.s b� SZ(ao M of h F"v f <br /> Equipment Blank I.D.: @ rye Duplicate I.D.: <br /> Analyzed for. TPH-G B= MTBE TPH-D Other. <br /> D.O. (if req'd): Pre-purge. 19I Post-purge- �l <br />