Laserfiche WebLink
I• <br /> SHELL WELL MONITORING DATA SHEET <br /> Project #: 9$0w Z3 - 5 VVTC #: Zoq-75 Zy- S 57V SSampler: M q4f + OU G— Date: q- Z-'3 -18 <br /> Well LD : M W - 17, Well Diameter: 2 3 (f4D 6 8 <br /> Total Well=Depth:= _ �_(: Depth�to Water:/Q=I=Z - <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: (PV-CD Grade D.O. Meter (if req'd): YSI HACH <br /> Well Diameter muiuRfle= Well Diameter Multiplier <br /> 2" 016 5" 102 <br /> 3" 037 6" 147 <br /> 4" 065 Other rad==-0 163 <br /> Purge Method Bader Sampling Method Bader <br /> Middleburg Extraction Port <br /> Electnc Submersible ✓ Other: <br /> Extraction Pump <br /> Other- <br /> - —1 905 _. x 3 -- t — Gals <br /> 1 Case Volume(Gals) Specked Volumes Calculated Volume <br /> Time Temp (°F) pH Cond. Turbidity Gals. Removed Observations <br /> • td� <br /> 60,-ka-i� l <br /> ��r j)-0 1rd GU I y 3 <br /> Did well dewater? Yes (N? Gallons actually evacuated: 1 q <br /> Sampling Time: [OZ,a Sampling Date: Z 3 <br /> Sample I.D.: N1 W- I Z Laboratory: Sequoia Crosby <br /> Analyzed for- TPH-G TEx E TPH-D Ocher• OX Crr� J y 9Z(00 6 1 llgrro 1 <br /> Equipment Blank I.D.: @ Duplicate LD <br /> Analyzed for: TPH-G BTEx MTBE TPH-D Ocher: <br /> D.O. (if req'd): Pre-purge '9/ Post-purge. 1D9/ <br />