Laserfiche WebLink
. such as MW-8 Once the system is installed, it may only need to be used when hydraulic control over <br /> the source area is needed, seasonally, for example <br /> In the event that the GWE system is needed, Cambria proposes to apply for a discharge permit from <br /> the City of Stockton as soon as this CAP is approved This will shorten the amount of time needed <br /> to install and startup the GWE system if it is needed <br /> Additional ORC Use <br /> If the use of ORCs proves to be effective in slowing or preventing the spread of hydrocarbons and/or <br /> MTBE, ORCs may be installed in additional wells <br /> IMPLEMENTATION SCHEDULE <br /> Implementation of this CAP will begin within two weeks of approval by SJCPHS <br /> Please call if you have any questions <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Joe Neely QRpFESS"; <br /> Protect Manager �=�h� LU,;,U�G L <br /> Diane M Lundquist E 41 NO 046725 <br /> Senior Engineer s C,V NA f <br /> C46725 l�jF or CA�"��"/a <br /> Attachments <br /> Table 1 Well/Boring/Probe Data <br /> Table 2 Soil Analytical Data <br /> Table 3 Well Concentrations <br /> Table 4 Domestic Well Concentrations <br /> Table 5 Aquifer Test Chemical Analytical Data <br /> Plate 1 Vicinity Map <br /> Plate 2 Site Map/Soil Chemical Analytical Data <br /> Plate 3 Ground Water Contour/Chemical Analytical Map <br /> Plate 4 RW-lA Constant Discharge Test Recovery Data <br /> Plate 5 MW-2 Constant Discharge Test Recovery Data <br /> 240-0783 29 <br />