My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012495
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2900 - Site Mitigation Program
>
PR0541989
>
ARCHIVED REPORTS XR0012495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 9:30:48 PM
Creation date
6/21/2019 4:50:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012495
RECORD_ID
PR0541989
PE
2950
FACILITY_ID
FA0024100
FACILITY_NAME
COUNTRY CLUB VALERO
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12302012
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUGRO VILEST, INC. <br /> 1050 Melody Lane,Suite 160 <br /> Roseville California 95678 <br /> January 12, 1995 Tel (916)782-2110 <br /> Fugro Project No 94-47-8620 FAX (916)786-7830 <br /> Ms Mary Meays <br /> San Joaquin County Public Health Services <br /> 9:-7nvirpamental Health Division <br /> -fast 61fice Box 388 <br /> '445 S San Joaquin <br /> fock(Dn, California 95201-0388 <br /> -Subject Addendum To December 22, 1994 Workplan <br /> Shell Service Station (WIC No 204-7524-3505) <br /> r� to 2575 Country Club Boulevard <br /> Stockton, California <br /> Dear Ms Meays <br /> Fugro West, Inc (Fugro), on behalf of Shell Oil Company (Shell), is providing this addendum <br /> to the December 22, 1994 workplan, as requested during January 9, 1995 telephone conversation <br /> This addendum addresses groundwater monitoring well locations, sampling intervals, laboratory <br /> analyses, well construction, and project schedule All fieldwork will be performed according to <br /> Fugro Standard Operating Procedures included with the December 22, 1994 workplan <br /> The scope of work proposed in this addendum may change due to unforeseen events and site <br /> conditions encountered during the field work Shell and Fugro's primary objective for this scope <br /> of work is to determine the distribution of petroleum hydrocarbons in the groundwater All field <br /> work and reporting will be conducted according to the California"LUFT" Manual, "Tri-Regional' <br /> guidelines, and the standards found in the San Joaquin County Public Health Services, <br /> Environmental Health Division (SJCPHS/EHD) Well Standards <br /> Background <br /> The December 22, 1994 workplan proposed a three-phased approach to a groundwater <br /> investigation at the subject site Phases 1 and 2 were a CPTIHydroPunch® investigation designed <br /> to determine the extent of petroleum hydrocarbons in the groundwater beneath the site Based <br /> on the data generated, Phase 3 would include the installation, development and sampling, of <br /> groundwater monitoring wells to confirm previously acquired data and provide permanent <br /> monitoring/remediation points <br /> 94478620 ADD A member of the Fugro group of companies with offices throughout the world <br />
The URL can be used to link to this page
Your browser does not support the video tag.