My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 10:23:11 AM
Creation date
6/24/2019 9:26:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 y <br /> ., gy p*. ' J <br /> EON COMPANY U.S.A. 0 CT 1 9 1992 <br /> POST OFFICE BOX 4032 . CONCORD, CA 94524-2032 c.NVIRONIVIENTAL HEALTH <br /> F�ER�IT����yl�EQ <br /> ENVIRONMENTAL ENGINEERING <br /> NARLA D. GUENSLER <br /> SENIOR ENVIRONMENTAL ENGINEER <br /> (510) 246-8776 <br /> October 14, 1992 <br /> Mr. Michael J. Infurna <br /> San Joaquin County <br /> Environmental Health Department <br /> P. 0. Box 2009 <br /> Stockton, California 95201 <br /> Subject: Exxon RS #7-3708 <br /> 2705 Country Club Boulevard <br /> Stockton, California <br /> Dear Mr. Infurna: <br /> Please find enclosed a final copy of the Quarterly Monitoring Report, Third <br /> Quarter 1992, prepared by Delta Environmental Consultants, Inc. , for the <br /> above referenced site. <br /> Exxon will continue monitoring the site on a quarterly basis. The next <br /> quarterly sampling event is scheduled for December 1992. <br /> Additional scope-of-work is currently being proposed for conducting an air <br /> sparging pilot test and ground water pumping test to obtain data that could <br /> be used for preparing a Preliminary Assessment Report. A workplan detailing <br /> the proposed work will be submitted to your agency by the end of the fourth <br /> quarter of 1992. <br /> If you have any questions or comments, or require additional information, <br /> please do not hesitate to contact me at the above listed phone number. <br /> Sincerely, <br /> Q <br /> Attachment <br /> c - w/attachment: <br /> Ms. Elizabeth Thayer - Central Valley RWQCB <br /> w/o attachment: <br /> Mr: Hugh` Miles - Delta Environmental <br /> HOG:pp <br /> 2529E/73708LTR <br /> A DIVISION OF EXXON(COR,PPORATION <br /> V,.J RECYMEo <br />
The URL can be used to link to this page
Your browser does not support the video tag.