Laserfiche WebLink
X <br /> "I 3330 Cameron Park Drive, Ste 550 <br /> Cameron Park, California 95682 <br /> (530)676-6004-Fax:(530)676-6005 <br /> April 7, 2006 <br /> Project No. 2007-0835-01 <br /> AFR 1 7 200:6 <br /> ENV1RU1NMEf,1 I I z'.P' i H <br /> Mr. Michael J. Infurna, Jr. PER!1 IT/SE! V(C'S <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Subject: Well Installation Work Plan <br /> Palisades Gas and Wash Station No. 835 <br /> 2705 Country Club Boulevard <br /> Stockton, California <br /> Dear Mr. Infama: <br /> Stratus Environmental Inc. (Stratus) has prepared this Well Installation Work Plan (Work <br /> Plan), on behalf of Palisades Gas and Wash (Palisades), for Station No. 835 (the site), <br /> located at 2705 Country Club Boulevard, Stockton, California (see Figure 1). In a letter <br /> dated February 21, 2006, San Joaquin County Environmental Health Department <br /> (SJCEHD) requested that previously documented petroleum hydrocarbon impact to <br /> groundwater be further assessed. <br /> . � These monitoring wells will be <br /> completed to variable depths in the subsurface, with the deeper screened wells completed <br /> across relatively permeable soil strata. Data presented in the January 9, 2006 Site <br /> Conceptual Model (SCM) submitted by Stratus, in conjunction with SJCEHD requests, <br /> were used to develop the scope of work presented in this document. Details associated <br /> with completion of the well installations are described in the following subsections of this <br /> Work Plan. <br /> SITE DESCRIPTION <br /> The site is an active service station and car wash located in a mixed residential and <br /> commercial neighborhood, at the northwest corner of the intersection of Ryde Avenue <br /> and Country Club Boulevard. The site operated as an Exxon-Branded service station <br /> (No. 7-3708) until November 1995. New West Petroleum operated the service station <br /> between November 1995 and November 1997; Palisades purchased the property from <br /> New West Petroleum at this time. <br /> KAUSA Gasoline\0835\Work Plans\palisades835 workplan2006.doc <br />