My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 10:20:10 AM
Creation date
6/24/2019 9:49:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Infurna, SJCEHD September 14, 2006 <br /> Well Installation Work Plan Addendum <br /> Palisades Station No. 835, Stockton, CA <br /> Page 3 <br /> annular space around the well casing. A watertight locking cap will be placed over the top <br /> of the well casing, and a traffic rated vault box will be installed around the top of the well. <br /> The actual well construction may be modified in the field based on conditions encountered <br /> at the time of the investigation. <br /> If you have any questions or comments concerning this Addendum, please contact Gowri <br /> Kowtha at (530) 676-6001. <br /> Sincerely, <br /> OTKATUO ENVIKONMENTAL, INC. <br /> C' OV <br /> Scott G. Bittinger, P.G. owri4. KoWtha, P.E. <br /> Project�eologist roject Manager <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Extended Site Plan <br /> Appendix A Proposed Well Detail Diagrams <br /> cc: Mr. Charles Miller, Palisades Gas and Wash <br /> Mr. James Barton, Regional Water Quality Control Board <br /> Ms. Jennifer Sedlachek, ExxonMobil <br /> Mr. Ted Moise, ETIC Engineering, Inc. <br /> K:AUSA GasoGneA0835AWork Plans\USA835 workplan addendum 2006.doc 5TKA TUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.