My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 10:20:10 AM
Creation date
6/24/2019 9:49:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD PRACTICES AND PROCEDURES <br /> General procedures used by Stratus in site assessments for drilling exploratory borings, <br /> collecting samples, and installing monitoring wells are described herein. These general <br /> procedures are used to provide consistent and reproducible results; however, some <br /> procedure may be modified based on site conditions. A California state-registered <br /> geologist supervises the following procedures. <br /> PRE-FIELD WORK ACTIVITIES <br /> Health and Safety Plan <br /> Field work performed by Stratus at the site is conducted according to guidelines established <br /> in a Site Health and Safety Plan (SHSP). The SHSP is a document which describes the <br /> hazards that may be encountered in the field and specifies protective equipment, work <br /> procedures, and emergency information. A copy of the SHSP is at the site and available <br /> for reference by appropriate parties during work at the site. <br /> Locating Underground Utilities <br /> Prior to commencement of any work that is to be below surface grade, the location of the <br /> excavation, boring, etc., is marked with white paint as required by law. An underground <br /> locating service such as Underground Service Alert (USA) is contacted. The locating <br /> company contacts the owners of the various utilities in the vicinity of the site to mark the <br /> locations of their underground utilities. Any invasive work is preceded by hand augering to <br /> a minimum depth of five feet below surface grade to avoid contact with underground <br /> utilities. <br /> FIELD METHODS AND PROCEDURES <br /> Exploratory Soil Borings <br /> Soil borings will be drilled using a truck-mounted, hollow stem auger drill rig. Soil <br /> samples for logging will be obtained from auger-return materials and by advancing a <br /> modified California split-spoon sampler equipped with brass or stainless steel liners into <br /> undisturbed soil beyond the tip of the auger. Soils will be logged by a geologist <br /> according to the Unified Soil Classification System and standard geological techniques. <br /> Drill cuttings well be screened using a portable photoionization detector(PID) or a flame <br /> ionization detector (FID). Exploratory soil borings not used for monitoring well <br /> installation will be backfilled to the surface with a bentonite-cement slurry pumped into <br /> the boring through a tremie pipe. <br /> Soil sampling equipment will be cleaned with a detergent water solution, rinsed with <br /> clean water, and equipped with clean liners between sampling intervals. Augers and <br /> M:\Field PracticesTield Practices and Procedures-revised 07-2004.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.