My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
FIELD DOCUMENTS FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 10:55:26 AM
Creation date
6/24/2019 10:01:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 3
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.p <br /> �1 TABLE 1 <br /> DRILLING AND WELL CONSTRUCTION SUMMARY <br /> FORMER PALISADES GAS AND WASH STATION NO.835 <br /> 2705 COUNTRY CLUB BOULEVARD <br /> STOCKTON,CALIFORNIA <br /> Well <br /> Boring Boring Well Depth Screen Slot <br /> fB-9 <br /> pth(ft.) Dia.(in.) Well No. Dia.(in.) (ft.) (ft.bgs) Size(in.) Method Date <br /> Status <br /> 31.5 8 <br /> 31.5 hollow stem auger 05/27/99 Grouted to Surface <br /> 36.5 8 hollow stem auger 05/27/99 Grouted to Surface <br /> 8 hollow stem auger 05/27/99 Grouted to Surface <br /> 1 80 2 <br /> cone penetrometer 09/06/05 Grouted to Surface <br /> 81 2 <br /> CPT-3 802 cone penetrometer 09/07/05 Grouted to Surface <br /> CPT-4 80 Z cone penetrometer 09/06/05 Grouted to Surface <br /> CPT-5 80 2 cone penetrometer 09/06/05 Grouted to Surface <br /> CPT-6 932 cone penetrometer 09/06/05 Grouted to Surface <br /> CPT-7 100cone penetrometer 09/07/05 Grouted to Surface <br /> 2 cone penetrometer 09/07/05 Grouted to Surface <br /> MW-1 1 20 12 MW-11 4 20 5-20 0.020 hollow stem auger 05/09/07 Active <br /> MW-12 50 9 MW-12 2 50 35-50 0.020 sonic 05/24/07 <br /> MW-13 50 9 MW-13 2 Active <br /> 48 33-48 0.020 sonic 05/29/07 Active <br /> MW-14 30 <br /> 9 MW-14 2 30 15-30 0.020 sonic 05/25/07 <br /> MW_15 27 8 MW-15 2 Active <br /> 20 5-20 0.020 hollow stem auger 10/05/07 Active <br /> MW-16 20 8 MW-16 2 20 5-20 0.020 hollow stem auger 10/05/07 Active <br /> MW-17 20 8 MW-17 2 19 4-19 0.020 hollow stem auger 05/18/07 Active <br /> MW-18 45 9 MW-1,8 2 42 32-42 0.020 sonic 05/23/07 Active <br /> MW-19 45 9 MW-19 2 42 32-42 0.020 sonic 05/22/07 <br /> MW-20 20 Active <br /> 12 MW-20 4 20 5-20 0.020 hollow stem auger 05/09/07 Active <br /> [MW-21 50 9 MW-21 2 45 30-45 0.020 sonic 05/31/07 Active <br /> bgEs=below ground surface '! <br /> usa83 5-drilling-.vel I-summary <br /> Page 2 of 2 STRATUS <br />
The URL can be used to link to this page
Your browser does not support the video tag.