Laserfiche WebLink
0706616SV - - <br /> �' August 27,2007 \ i <br /> Page 2 of 5 �I <br /> In accordance with General Provision No. 6, SEVEN WORKING DAYS PRIOR to the start of <br /> this work,Permittee shall notify the State Representative JOSEPH A. VALDEZ,P.O. Box 2048 <br /> Stockton, CA 95201, (209) 948-3656. All work requiring traffic control must apply for a <br /> closure number days prior to start of work. No closures on HOLIDAYS or WEEKENDS. <br /> All work under this permit must meet with the approval of the State Representative. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation of this <br /> permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, <br /> PERMITTEE SHALL FILL OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY <br /> GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications shall include <br /> State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, and <br /> Business and Professions Code, Section 8771. Permittee shall physically inspect the work site <br /> and locate survey monuments prior to work commencement. Monuments shall be referenced or <br /> reset in accordance with Business and Professions Code. <br /> Traffic Management Requirements: <br /> a. Permitee/Contractor shall work with Permit Inspector to request the necessary lane <br /> closures needed. Requests shall be made the week prior to the actual work. Permit <br /> Inspector shall submit closure through the Lane Closure System (LCS) for our <br /> approval by Wednesday afternoon of the week prior. <br /> b. All lane closures shall be called in by either the Contractor to the Traffic <br /> Management Center (TMC)when the closure begins (10-97), ends (10-98), or is <br /> canceled(16-22). The TMC can be reached 24-7 at (209) 948-7556 or 7551. <br /> c. Use proper Traffic Control devices throughout the duration of the project as per <br /> Caltrans Standard Specifications. <br /> d. All night-time work requires COZEEP and will be coordinated by inspector. <br /> Inspector shall advise permit applicant that COZEEP must be present,since night- <br /> time work is only allowed per lane chart. <br /> A pre-job conference with the Permittee, Contractor, and State Representative may be required <br /> prior to start of work. Permittee shall contact the State Representative and arrange the meeting. <br /> This meeting may be waived at the discretion of the State Representative. <br /> Permittee shall, prior to commencement of any work, provide the State Representative with the <br /> name and phone number of the person in responsible charge of the work to be performed <br /> under this permit. <br /> In accordance with Section 6500 of the Labor Code, a Cal-OSHA permit is required prior to the <br /> start of work. <br />