Laserfiche WebLink
' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' No additional activities were performed at the site <br /> WORK PROPOSED FOR NEXT QUARTER <br /> ExxonMobil is in the process of transferring well ownership to a new responsible party <br /> Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> 1 • <br /> 1 <br /> 1 <br /> • <br /> 9\MJccts\7370gVnasleT\wp1go6O5\370$tc)a doc 2 <br />