Laserfiche WebLink
' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> 1 No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br /> 1 <br />' Attachments <br /> Figure 1 Site PIan Showing Groundwater Elevations and Analytical Results <br /> tTable 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> 1• <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> 1 <br />' 9\prqjects\737081maner\wp\gWO4\3708t"t doc 2 <br />