Laserfiche WebLink
I <br /> ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXT QUARTER <br />' Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br />' Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br />' Table 3 Groundwater Monitoring Plan <br />' Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 9 lprojects%737091mwerdwp1goom\3708text doe 2 <br />