Laserfiche WebLink
ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> The groundwater samples collected during the 3 March 2004 monitoring event were received by the <br /> laboratory at a temperature of 9 8 degrees Celsius The site was re-sampled on 22 March 2004, and <br />' the analytical results are presented in Table 2 <br /> Joint groundwater monitoring was performed with the environmental consultant for the neighboring <br />' 7-Eleven site on 3 March 2004 <br />' WORK PROPOSED FOR NEXT QUARTER <br />' Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> • Table 3 Groundwater Monitoring Plan <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> I <br /> 1 <br /> i <br /> 1 <br /> I <br />' 9�PmjeetsV370a%naster\wp1g0304\3706textdoc 2 <br />