My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003352
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
ARCHIVED REPORTS XR0003352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 11:47:45 AM
Creation date
6/24/2019 10:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003352
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 0 REMEDIAL ACTIONS <br /> 5.1 Soil Overexcavation and Site Renovation <br /> The following discussion regarding remedial actions completed at the site is based on <br /> information obtained during a review of available SJCEHD files <br /> Exxon replaced the site USTs and product delivery lines in December 1995 and January 1996 <br /> The new USTs were placed in a different cavity than the former UST complex (see Figure 2) A <br /> larger than necessary UST cavity was excavated in order to remove extra petroleum hydrocarbon <br /> impacted soil from the subsurface An estimated 700 cubic yards of soil was excavated and <br /> removed from the site in the area where the current USTs are situated An additional 62 cubic <br /> yards of soil (estimate) was excavated and removed in order to place the current product delivery <br /> lines and fuel dispensers Delta submitted a report titled Soil Excavation and Sampling Results <br /> in May 1996 to document the excavation and sampling activities <br /> Lateral conveyance piping was reportedly installed at the site in January 1996, in the event that <br /> soil vapor extraction (SVE) was to be implemented in the future The conveyance piping was <br /> connected to wells VEW-1 and VEW-3 It is our understanding that SVE was never <br /> implemented <br /> K IUSA GasohneM35tiReportslusa835 scm-assessment report doc Page 12 5MATU5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.