Laserfiche WebLink
� o.� <br /> POTENTIAL POTENTIAL POTENTIAL O`ari o�� �� <br /> PRIMARY SECONDARY TRANSPORT EXPOSURE EXPOSURE P <br /> SOURCES SOURCES MECHANISMS PATHWAYS ROUTES <br /> DERMAL <br /> AFFECTED SOIL CON TACT <br /> SURFACE SOILS <br /> <3FEET <br /> WIND EROSION AND <br /> ATMOSPHERIC INGESTION <br /> SPILLS AND DISPERSION <br /> LEAKS FROM <br /> USTS AND AFFECTED AIR <br /> HISTORICAL SUBSURFACE SOILS INDOOR INHALATION <br /> >3.FEET VOLATILIZATION AND O O O <br /> SITE ATMOSPHERIC <br /> OPERATION DISPERSION <br /> OUTDOOR INHALATION 0 0 0 O O <br /> DISSOLVED VOLATILIZATION AND <br /> GROUNDWATER ENCLOSED SPACE <br /> PLUME ACCUMULATION <br /> DERMAL O O O O O <br /> LEACHING AND CONTACT <br /> GROUNDWATER GROUNDWATER <br /> NON-AQUEOUS TRANSPORT INGESTION Q O O O O <br /> PHASE LIQUID <br /> (NAPL) <br /> MOBILE NAPL <br /> MIGRATION <br /> AFFECTED DERMAL <br /> SURFACE SOILS CONTACT <br /> OR SURFACE SURFACE WATER <br /> WATER <br /> STORM WATER/ INGESTION <br /> SURFACE WATER <br /> TRANSPORT <br /> LEGEND <br /> . COMPLETE PATHWAY <br /> O INCOMPLETE PATHWAY FIGURE 12 <br /> POTENTIAL EXPOSURE PATHWAY MODEL <br /> ASSUMES WORKERS ARE APPRISED OF THE POTENTIAL HAZARDS ANDARE PROPERLYTRAINED <br /> CONSTRUCTION WORKERS ASSUMED NOT TO BE EXCAVATING AT SITE IN VICINITYOF DISPENSER SERVICE STATION NO 835 <br /> ISLANDS DEEPER THAN THREE FEET BELOW GROUND SURFACE MAINTAINANCE WORKERSASSUMED 2705 COUNTRY CLUB BOULEVARD <br /> NOT TO BE EXCAVATING AT SITE BUILIDING SLAB ASSUMED TO BE INTACT STOCKTON,CALIFORNIA <br /> PROJECTNO DRAM BY 5r�,�rv5 <br /> USA 835 JMP 1MIMS <br /> FILENO PREPAREDBY ENVIRONMENTAL,INC <br /> 20"-083581 MA <br /> REVISIONNO REVIEWED BY <br /> 1 <br />