My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003352
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
ARCHIVED REPORTS XR0003352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 11:47:45 AM
Creation date
6/24/2019 10:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003352
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • 3 0 HISTORICAL AND 2005 SITE ASSESSMENT ACTIVITIES <br /> Assessment of petroleum hydrocarbon impact was initiated in August 1991 by consultants <br /> representing Exxon Prior to the September 2005 investigation, all site characterization activities <br /> were completed on behalf of Exxon The following is a summary of environmental assessment <br /> activities conducted to date This summary was prepared using information available in <br /> SJCEHD files for the site Locations of all soil borings and wells are included on Figure 2 <br /> Historical information regarding soil boring depths and well construction details are summarized <br /> in Table 1 Based on the extent of information available to Stratus personnel at the time this <br /> report was prepared, it appears that all site characterization activities described below were <br /> completed under the direction of Delta Environmental Consultants, Inc (Delta), with the <br /> exception of soil borings B-1 through B-10, which were implemented by Alton Geoscience, Inc <br /> (Alton) <br /> 31 Summary of Environmental Investigations <br /> ® Monitoring wells MW-1 through MW-3 were installed in August 1991 <br /> o Soil borings B-1 through B-10 were advanced in December 1991 <br /> a Monitoring wells MW-4 through MW-6 were completed in February 1992 <br /> o Monitoring wells MW-7 and MW-8 were constructed in March 1994 <br /> o Compliance soil sampling was completed in March 1994 at the time of UST and product <br /> line removal activities <br /> o Vapor extraction wells VEW-1 and VEW-2 were installed, and borings SB-1 through <br /> SB-3 were advanced, in January 1995 <br /> o Compliance soil and groundwater sampling was completed in December 1995, at the <br /> time that the new UST cavity was excavated Well VEW-2 was properly destroyed <br /> during the excavation <br /> Well VEW-3 was installed in May 1997 <br /> o Soil borings SB-4 through SB-9 were advanced, and monitoring wells MW-9 and <br /> MW-10 were constructed, in May 1999 <br /> 3.2 2005 Site Characterization Activities <br /> The objectives of the site assessment activities were to <br /> o Further characterize the lateral and vertical extent of petroleum hydrocarbon impact to <br /> soil and groundwater <br /> o Additionally characterize the geology beneath the site <br /> To accomplish these objectives, Stratus implemented the following work activities <br /> o Advanced seven (7) CPT borings (CPT-1 through CPT-7) to depths ranging from <br /> approximately 80 to 100 feet bgs <br /> K\USA Gasolme\0835\Reparts\usa835-scm-assessment report doc Page 5 57RATU5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.