Laserfiche WebLink
r 1 ■� � <br /> x ■ <br /> Engrneenng,[n- GROUNDWATER PURGE AND SAMPLE Date <br /> Project Name Exxon 7-3708 Well No } IA <br /> Project No UP3708 1 Personnel p <br />' GAUGING DATA <br /> Water Level Measuring Method Measuring Point Description TOC <br /> epth i3 th a e <br /> ' {feet <br />' sCA"L IJLATIOIV _ �l <br /> t10 <br /> 2 04 0 16 064 1 44 <br /> 4 _ <br />' PURGING DATA <br /> Purge Method Submersible Pump Purge Depth Screen Purge Rate (gprr3) <br />' Time i J L1 � j L j 7 `E <br /> Volume Purge(gal) ` 2�_ <br />' Temperature(C) Z 1 2 Z2 <br /> c <br /> ptiD5 <br />' Spec Cond(umhos) Z c-6 <br /> TurbiditylColor�— <br /> Odor(YlN) r 1� <br />' Casing Volumcs <br /> Dewatered(YIN) �1 <br />' Comments/Observbattons <br /> ' rSAMPL;INNG DATA <br /> me SaedApproximatr� Depth to Water During Sampling 3 (feef) <br /> mme <br /> Number of' Volume Filled Turbidity! Color Analysis Sample Number Container Type Perservative (ml- or L} Method <br /> Containers <br /> 3 <br /> Voa HCL 46 ml <br /> �TFIJarEx MreE <br /> ' Total Purge Voli,wie (ga)lons) D�soosal <br /> Weather Conditions r <br /> Condition of Welk Box and Casing at Time of Sarnplinq <br /> Well Head Conditions Requwnng co,rpc,t,orl -, f � _ — <br /> Problerns Fncoiwteted Durinq Prirg111k, 3n(' <br /> Coinii�er�ts <br />