My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
3500 - Local Oversight Program
>
PR0544596
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:13:21 PM
Creation date
6/24/2019 11:39:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544596
PE
3528
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> r <br /> S ECOR <br /> i <br /> 7-Eleven Store#14117 <br /> Work Plan for Additional Site Assessment <br /> July 27, 2004 <br /> Page 6 <br /> Monitoring wells MW-9 and MW-10 will be added to the quarterly monitoring and sampling <br /> program. Groundwater samples will be analyzed for TPHg, BTEX, and fuel oxygenates. <br /> Waste Disposal <br /> Soil cuttings and rinsate water generated during drilling operations will be temporarily <br /> stored onsite in properly labeled Department of Transportation (DOT) approved 55-gallon <br /> drums pending characterization and disposal. The soil and rinsate water will be removed <br /> by SECOR's disposal contractor to an appropriate disposal facility. The drums will be <br /> temporarily stored onsite for approximately 2-3 weeks. <br /> REPORTING AND SCHEDULE <br /> SECOR will prepare a report summarizing the fieldwork completed and data collected that <br /> will include: <br /> • Details of field procedures and operations; <br /> • Boring and well completion logs; <br /> • Soil and groundwater analytical data; <br /> • Updated map showing the location of borings and wells; <br /> • Cross sections showing soil stratigraphy and areas of contamination; and <br /> • Isoconcentration maps of specific contaminants, e.g., TBA. <br /> SECOR will begin permitting the wells and soil borings upon the SJCEHD approval of this <br /> work plan. Scheduling of well installation and soil boring advancement will depend on <br /> access agreement procurement from the offsite property owners. <br /> File:7-11/14117 WP for additional assessment(July 04).doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.