My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
3500 - Local Oversight Program
>
PR0544596
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 1:35:21 PM
Creation date
6/24/2019 1:15:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544596
PE
3528
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Page 1 of 1 <br /> 1 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Wednesday, June 13, 2007 8:40 AM <br /> To: Mike Infurna[EH] <br /> Subject: RE: 2725 Country Club, Stockton 7/11"#14117 <br /> FYI <br /> From: Mike Infurna_[EH]_, <br /> Sent: Monday, May 21, 2007 3:39 PM <br /> To: Damon Brown <br /> Subject: 2725 Country Club, Stockton "7/11" #14117 <br /> Damon, <br /> With that last email from Jim Barton concerning the 02 injection and WDR evaluation completed and <br /> satisfactory, the site is now in a position to send in the detailed work plan/proposal for full remediation that <br /> is required. <br /> Please submit a CAP that includes well design, specifications, and locations for me to review. <br /> I'll generate a comment letter after I review it. <br /> Just to remind you, if the CAP is ok, I'll tentatively approve it pending successful completion of the Public <br /> Participation phase. Public Participation (UST Regs, Section 2728) is required.prior to a UST site entering <br /> into remediation. I'll detail the requirements for Public Participation after the CAP is tentatively approved. <br /> Reply please with your schedule/long and short term plans for this site as related to 02 injection. (work <br /> plan submittal date, system setup, drilling, etc) <br /> 6/13/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.