My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3201
>
1900 - Hazardous Materials Program
>
PR0531229
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 4:45:10 PM
Creation date
6/24/2019 1:20:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0531229
PE
1920
FACILITY_ID
FA0020115
FACILITY_NAME
ACE HARDWARE #6492
STREET_NUMBER
3201
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10017009
CURRENT_STATUS
01
SITE_LOCATION
3201 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response / Contingency Plan — Page 4 of 4 <br />Rev. 06/27/11 <br />H. EARTHQUAKE VULNERABILITY <br />Identify areas of the facility that we vulnerable it) hazardous materials releases / spills due to earthquake-rclated motion. These areas require immediatc, isolation and <br />ins trioti. <br />VULNERABLE AREAS: (Check all that apply) tet.i LOCATIONS shop, outdoor shod, forensic lab) <br />[9 1, HAZARDOUS MATERIALS / WASTE STORAGE AREA IFRONT OF THE STORE H2. <br />0 2. PROCESS LINES/ PIPING Hi, <br />[1 1 LABORATORY R4. <br />C] 4, WASTE TREATMENT AREA Hs. <br />Identify mechanical sstenn vulnerable to releasees / spills due to earthquakc-related motion. These, systems require immediate isolation and inspection. <br />VULNERABLE SYSTEMS: (Check all that apply) Na. <br />I LOCATIONS <br />1, SHELVES, CABINET',; AND RACKS <br />iINSiDE STORE <br />0 2. TANKS (EMERGENCY smyrom <br />H& <br />3. PORTABLE GAS CYLINDERS <br />6F'ft4E STORE <br />4. FMF',RGENCY SHUTOFF AND/OR UTILITY VALVES <br />RIO, <br />❑ 5. SPRINKLER SYSTEMS <br />HM <br />0 6. STATIONARY PRESSURTZED CONTAINERS (c,g_ Propane dispensing tank) <br />H12. <br />I. EMPLOYEE TRAINING <br />Explanation of Requirement Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up operations <br />including volunteers and/or contractors. Training must be: <br />• Provided within 6 months for new hires; <br />• Amended as necessary prior to change in process or work assignment, <br />• Given upon modification to the Emergency Response /Contingency Plan, and updated,"refirshed annually for all employees. <br />Required content includes all of the following- <br />• Material Safety Data Sheets; * Communication and alarm systems; <br />• Hazard communication related to health and safety; * Personal protective equipment; <br />• Methods for safe handling of hazardous substances; 9 Use of emergency response equipment (c,g. Fire extinguishers, respirators, <br />• Fire hazards of materials / processes; etc.); <br />• Conditions likely to worsen emergencies; * Decontamination procedures, <br />• Coordination of emergency response; * Evacuation procedures, <br />• Notification procedures; * Control and containment procedures: <br />• Applicable laws and rrgulations� * UST monitoring system equipment and procedures (if fflicable). <br />INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED ((-Iwck all that apply) tt <br />❑ 1, FORMAL CLASSROOM; 0 2. VIDEOS; 3, SAFETY / TAILGATE MEETINGS; <br />4. STUDY GUIDES 1 MANUALS (Specify <br />CIS, OTHER (Specify): <br />0 6. NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES <br />Large Quantity Generator (LQG) Training Retards. Large quantity hazardous waste generators (i,e,, who generate more than 270 gallonsJIODO kilogram of <br />hazardous waste per month) must retain written documentation of employee haardous waste management training sessions which includes: <br />• A written outlin6agenda of the type and amount of both introductory and continuing training that will bo, given to persons filling -each job Position having <br />responsibility for the management of hazardous waste (e.g., labeling, manifesting, compliance with accumulation time limits, etc.). <br />• The name, job title, and date of training for each hazardous waste management training session given to an employee filling such a job position; and <br />• A written job description for each of the above job positions that describes job duties and the skills, education, or other qualifications required of personnel assigned <br />to the position. <br />• Current employee training rwot* must be retained until closure of the facility, <br />• Former employee train/ ng records must be retained at least three years after termination ofemP loyment, <br />J. LIST OF ATTACHMENTS <br />(Check one of the following) <br />211, NO ATTACHMENTS ARE REQUIRED; or <br />0 1 THE FOLLOWING DOCUMENTS ARE ATTACHER; <br />IL SIGNATURE / CERT I F ICATION <br />Certification- Based on my inquiry of those individuals responsible for obtaining the information, I certify under penalty of law that I have pemnally examined and <br />am familiar with the information submitted and believe the information is true, accurate, and complete, and that a copy is available on site. <br />S1CrNA 01 OWNER( TOR <br />DATE <br />IG KL <br />*250ME Of SIGNER (priat: KI <br />TrrLE OF SIGNER K3. <br />JAMES (VARY <br />STORE MANAGER <br />
The URL can be used to link to this page
Your browser does not support the video tag.