My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003365
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
3500 - Local Oversight Program
>
PR0544596
>
ARCHIVED REPORTS XR0003365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:29:55 PM
Creation date
6/24/2019 1:29:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003365
RECORD_ID
PR0544596
PE
3528
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NAME 7-Eleven Store#14117 JOB NUMBER 77EL 14117 04 0603 <br /> SITE ADDRESS 272_5 Country Club Blvd START DATE <br /> Stockton DATE PREPARED 04/25/05 <br /> PREPARED FOR Damon Brown PREPARED BY Damon Brown <br /> _WORK REQUEST FORM <br /> SCOPE OF WORK. Advance 3 CPT borings,2 GP borings&Install 1 Oxygen In,fectian Well <br /> 1)_ Arrive at site-Review(1) HASP, (2)work order <br /> _ <br /> 2)__ Gregg Drilling will be onsite at 7am Tuesday 04/26/05 <br /> _ Review HASP&conduct safety meeting with Gregg Drilling <br /> _ Review scope of work and conduct site walk- <br /> Check in with Daniel Davis and Jaff Auchterlonie <br /> 3} Set-up on CPT-3 -Flash Safety will provide traffic control&will be onsite @Sam{916)452-4855 <br /> _ Review work plan for details of CPT advancement(CPT-1 through CPT-3) <br /> The CPT borings will be drilled to approx 110 feet bgs <br /> _ Collect water s sam leat ox 70, 90 and 110 feet b s_ or the high-permeable soil zo <br /> samples PPr_ 9 _ nes <br /> Collect soil samples at approx 60, 70 and 80 feet in CPT-1 _ <br /> WATER SAMPLES MUST BE COLLECTED IN SEPARATE BORINGS <br /> 4) Advance CPT-1 &CPT-2 following same proceedures as CPT-3 <br /> -No soil samples <br /> Advance GP-1 &GP-2 - <br /> -Retain one soil sample from each at 10 feet for analysis <br /> -Collect grab groundwater from each <br /> 5) Install 1-1 -Second crew from Gregg Drilling on site at 7am on Thursday 04/28/05 <br /> -Remember to review HASP with second drilling crew <br /> -_Call Mike Infurna 20 minutes before casing goes in @ 209-982-8771 <br /> • 6) Cal! Daniel or Jaff before leaving site <br /> 7 Deliver all samples to Kiff Analytical in Davis for analysis <br /> EQUIPMENT NEEDED <br /> Health 8, Safety Plan <br /> Brass sleeves,Teflon Tape, caps, labels, sharpie,drill logs digital camera <br /> Traffic signs,delineators,caution tape,cooler, ice - <br /> GENERAL INFORMATION - - - ' - _ <br /> Direct all questions to Jaff Auchterlonie (916)861-0400 ext 223-office <br /> PROJECT MANAGER, Damon Brown AUTHORIZATION <br /> 14117 Country Club Drilling xis <br />
The URL can be used to link to this page
Your browser does not support the video tag.