My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003368
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2725
>
3500 - Local Oversight Program
>
PR0544596
>
ARCHIVED REPORTS XR0003368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:33:29 PM
Creation date
6/24/2019 1:31:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003368
RECORD_ID
PR0544596
PE
3528
FACILITY_ID
FA0002064
FACILITY_NAME
7-ELEVEN INC. STORE #14117
STREET_NUMBER
2725
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2725 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S EC0lid <br /> 7-Eleven Store#14117 <br /> Quarterly Groundwater Monitoring Report (1Q2005) <br /> May 24, 2005 <br /> . Page 3 <br /> Per the request of the SJCEHD, groundwater monitoring and sampling is coordinated with a <br /> former Exxon site (currently a USA Gasoline station) immediately east of the 7-Eleven site <br /> On July 22, 2004 , SECOR submitted a proposal for a Field Test Program for Evaluation of <br /> Oxidation Capacity of Groundwater to the RWQCB The RWQCB conditionally approved <br /> the proposal in a letter dated October 4, 2004 <br /> On July 27, 2004, SECOR submitted a Work Plan for Additional Offsite Assessment to the <br /> SJCEHD The work plan was approved by the SJCEHD in a letter dated August 23, 2004 The <br /> work plan proposed the installation of two offsite groundwater monitoring wells (MW-9 and MW- <br /> 10), advancing three offsite soil borings (GP-1 through GP-3), two offsite CPT borings (CPT-2 <br /> and CPT-3) and one onsite CPT boring (CPT-1) (Figure 4) <br /> MONITORING AND SAMPLING PROCEDURES <br /> The depth to water was measured to within 0 01 feet bgs in monitoring wells MW-1 through <br /> MW-8 from top of casing (TOC) using a water level indicator Dissolved oxygen <br /> concentrations were also measured in each well using a YSI Model 550A dissolved oxygen <br /> meter equipped with a down hole sensor <br /> Well purging and sampling equipment was thoroughly cleaned prior to purging and <br /> sampling each well The sampling procedure for each well included measuring the water <br /> level and checking for the presence of liquid-phase hydrocarbons (LPH), using either an <br /> electronic indicator and a clear Teflon® bailer or an oil-water interface probe Wells not <br /> containing LPH were purged of approximately three casing volumes of water (or to dryness) <br /> using a submersible pump or bailer The equipment and purging methods used for the <br /> current sampling event are noted on the field data sheets in Attachment A During purging, <br /> temperature, pH, and electrical conductivity were monitored After purging, water levels <br /> were allowed to recover to 80% of the original levels prior to collection of the water sample <br /> Groundwater samples were collected using a disposable Teflon® bailer, placed into <br /> appropriate Environmental Protection Agency EPA approved containers, labeled, logged <br /> onto chain-of-custody documents, and transported on ice to a California state-certified <br /> laboratory Copies of the field notes are presented in Attachment A <br /> GROUNDWATER SAMPLE ANALYSES AND RESULTS <br /> The groundwater samples collected from MW-1 through MW-8 were analyzed for TPHg, <br /> BTEX, and the fuel oxygenates MtBE, tert-butyl alcohol (TBA), diisopropyl ether (DIPE), <br /> ethyl-tert-butyl ether (EtBE), tert-amyl-methyl ether (TAME), 1,2-dichloroethane (1,2-DCA), <br /> and 1,2-dibromoethane (EDB) by EPA Method 82608 The certified laboratory analytical <br /> report and chain-of-custody documentation are presented as Attachment B <br /> Groundwater analytical results are presented on Figure 3, and are summarized in Tables 1 <br /> and 2 Hydrocarbon concentrations in MW-1 and MW-3 through MW-8 were generally <br /> consistent with historical data <br /> PURGE AND RINSATE WATER DISPOSAL <br /> Water generated during well sampling and equipment cleaning was pumped into a SECOR <br /> truck-mounted water tank The water was transferred into properly labeled 55-gallon drums <br /> 14117 05-1 Q Report doc SECOR Intemational Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.