Laserfiche WebLink
OB NAME 7-Eleven Store#14117 JOB NUMBER 77EL 14117 03 0702 <br /> SITE ADDRESS 2725 Country Club Lane START DATE <br /> Stockton CA DATE PREPARED 5122103 <br /> REPARED FOR Tom Miller PREPARED BY Danielle Catlin-Wri ht <br /> WORK REQUESTFORM <br /> SCOPE OF WORK 2nd QUARTER 2003 MONITOR AND SAMPLE 7 WELLS <br /> 1) Arrive at site-Review(1) HASP (2)work order then call Brian Carey in Sacramento <br /> _ Check in with 7-Eleven store manager Store Phone 209)463-1259 Franchisee Satinder& Blpt Bal <br /> o n g els equilibrate (DTW should be 9 feet+or-) <br /> 2) pen all wells shown_ on attached table and let groundwater levels _ <br /> 3) Monitor DTW, DTB, PT, and DO in the wells shown on attached table(Top of Casing) <br /> Note calibration readings for D O meter and take D O readings In bucket with agitated water <br /> (Note if any wells have measurable thickness of product, visually inspect with bailer) <br /> Clean to Dirty Order is Shown on Groundwater GaugingForm <br /> 4) Using a Grundfos pump system purge three casino volumes of water per well ^ <br /> Measure&record pH, conductivity, and temperature of the purged water from all wells <br /> 5) Collect f_our_(4)40-ml preserved VOAs from each sampled well BTEX,TPHg, &5 Oxygenates <br /> EPA Method 8260B <br /> 8 Place all purge water in 55-gallon drums and store onsite Be sure to properly label drums <br /> Note contents of drums on field notes Note location of drums on attached site map <br /> 9) Fill out COC and request EPA 8260B on "Standard Turnaround" <br /> 10 Deliver all samples to Kiff Analytical a 2795 2nd Street,Suite 300, Davis,CA 95616 <br /> 530 297-4800 <br /> 11) Call Jaff Auchterlonie in Sacramento before you leave the site _ <br /> 12 Fill Out Equipment Billin Sheet for all equipment used on the job and attach with field notes <br /> 13) Give copies of all notes and COC's to Brian Carey,ASAP <br /> 14) Bill Travel time to 77EL 14117 03 0711 <br /> Bill labor time to 77EL 14117 03 0702 max 6 hours onsite labor <br /> EQUIPMENT NI~EDED. _ <br /> Health&Safety Site Plan <br /> 28-40 ml preserved(HCI)VOAs(bring extra containers)and cooler with ice ^� <br /> _GrunD <br /> fos Pump System, pHfremp/Cond Meter, _O Meter, Disposable Bailers, COC's, drum labels etc <br /> 112"_9116', and 15116"sockets, and other mist tools <br /> TWO 66allon drums <br /> GENERAL INFORMATION <br /> Direct all questions to Jaff Auchterlonie, 916 861-0400 ext 223-office <br /> PROJECT MANAGER, Jaff Auchterlonie AUTHORI7ATION (Vi allrc&� <br /> File CenturyMoACirder/CB-MAS 5 xis <br /> 0 <br />