My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2782
>
2900 - Site Mitigation Program
>
PR0516515
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 2:39:39 PM
Creation date
6/24/2019 1:50:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516515
PE
2950
FACILITY_ID
FA0012652
FACILITY_NAME
SAFEWAY STORE #1769
STREET_NUMBER
2782
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2782 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PWHSY ` 035 Prospect Park Drive <br /> 11 Suite 40 <br /> GEOTRANS Rancho Cordova, California <br /> ;90kzA 1 ` 95670 <br /> A TETRA TECH COMPANY 916-853-1800 FAX 916-853-1860 <br /> December 12, 2000 <br /> P:\PROJECTS\Safeway\L284\Stociftn-103\1769—EA—Update.doc <br /> Mr. Robert Dawes <br /> Safeway Inc. <br /> Real Estate Department <br /> 5918 Stoneridge Mall Road <br /> Pleasanton, CA 94588-3229 <br /> Mr. Douglas Jacobsen <br /> Jacobsen Family Holdings 11, LLC <br /> 23433 Hatteras Street, Main Building <br /> Woodland Hills, California 91367 <br /> SUBJECT: PHASE I ENVIRONMENTAL ASSESSMENT UPDATE <br /> AND PRE-GAS STATION PHASE II REPORT <br /> SAFEWAY STORE#1769 PROPOSED GAS STATION SITE <br /> 2782 COUNTRY CLUB BOULEVARD <br /> STOCKTON, CALIFORNIA <br /> HSI GEOTRANS PROJECT No. L284-103 <br /> Dear Mr. Dawes and Mr. Jacobsen: <br /> HSI GeoTrans has completed the Phase I Environmental Assessment Update and Pre-Gas <br /> Station Phase II sampling report for the subject site. One copy of the report is being submitted <br /> to Mr. Jacobsen, and two copies are being submitted to Mr. Dawes. <br /> The Phase I Update scope of work focused on comparing existing site conditions at the location <br /> of the proposed gas station pad in the Safeway store parking lot with those previously reported <br /> in a Phase I environmental assessment report prepared for a larger site which included the gas <br /> station pad. The prior Phase I report was prepared in January 2000. The Phase II scope of <br /> work focused on establishing baseline soil and groundwater conditions at the proposed gas <br /> station site. <br /> Please contact me if you have questions regarding the report. <br /> Sincerely, <br /> Tim Costello <br /> Senior Scientist <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.