My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
3800
>
3500 - Local Oversight Program
>
PR0544597
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 3:52:37 PM
Creation date
6/24/2019 2:03:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544597
PE
3528
FACILITY_ID
FA0002327
FACILITY_NAME
STOCKTON GOLF & COUNTRY CLUB
STREET_NUMBER
3800
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
10902006
CURRENT_STATUS
02
SITE_LOCATION
3800 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stocton Golf& Country Club -2- July 7, 1998 <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to <br /> undertake interim remedial action after: (1)notifying the regulatory agency of the proposed action, and; <br /> (2) complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> only be proposed: necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health,safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)227-2784. <br /> Sincerely, <br /> Pamela Rarick <br /> Claim Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr.Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB,Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento,CA 95827-3098 Stockton, CA 95201 <br /> California Environmental Protection agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.