My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
3500 - Local Oversight Program
>
PR0544571
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:27:25 AM
Creation date
6/25/2019 8:12:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544571
PE
3528
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
02
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1.. <br /> 100Pringle Avenue. Suit <br /> Walnut Creek.CA 94596351'1) Woodwai -Clyde Consultants <br /> Wai <br /> 415-945-3000 <br /> October 28, 1986 <br /> 90371A <br /> Q <br /> OCT 2 91986 <br /> Ms. Laurie Cotulla , R.S. ENViROMENTAI HEA�Tt{ <br /> San Joaquin Local Health District 'PERMIT/SERVICES <br /> 1601 East Hazelton Avenue <br /> Stockton, Ca 95201 <br /> Dear Ms. Cotulla : <br /> Please find the enclosed permit application and $35 check for the two <br /> proposed monitoring wells and the 16 existing monitoring wells at the LOF <br /> Glass facility in Lathrop, California. As discussed, we would like to put <br /> all of the wells on the same permit. A sketch showing the locations of the <br /> proposed wells is provided in Figure 1. The area shown is at the east end <br /> of the main building (Laminating Plant) . The locati-ons of the existing <br /> wells are shown in Figure 2. The general well construction details for <br /> wells MW-1 through MW-12 are given in Figure 3, while the individual <br /> details for wells MW-13 through MW-16 are shown in Figures 4 through 7. <br /> The proposed wells will be constructed in much the same way as the existing <br /> wells. The workman 's compensation form will be ,sent Federal Express to <br /> your attention from the driller on October 29, 1986, while LOF will <br /> probably deliver the release authorization in person. <br /> If you have any questions or comments, please do not hesitate to call . <br /> Sincerely, <br /> Martin Cramer <br /> Project Scientist <br /> MC/sst/90371A <br /> Enclosures <br /> i <br /> i <br /> I <br /> I <br /> Consulting Engineers,Geologists <br /> and Environmental Scientists A�A <br /> Offices in Other Principal Cities _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.