Laserfiche WebLink
i <br /> J <br /> LOF Glass <br /> i <br /> Libbey-Owens-Ford Company <br /> November 17, 1986 <br /> Mr . Gordon Boggs <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3201 S Street <br /> Sacramento, California 95316-7090 <br /> Dear Mr . Boggs: <br /> Please find enclosed our consultant' s report , SUBSURFACE <br /> GASOLINE CONTAMINATION REMEDIAL ASSESSMENT. We concur with the <br /> conclusions and recommendations of this report . <br /> As stated in the report we are anxious to complete the <br /> installation of the inventory reconciliation system for the 5000 <br /> gallon existing tank and pour the concrete slab at the excavation <br /> site before the coming rains endanger the existing tank . We will <br /> be backfilling the excavation site this week and are planning to <br /> pour concrete the week of November 24th . <br /> We have implemented a monitoring program for MW-17 and MW-18 <br /> which includes monthly examination for free product and <br /> measurements of ground water elevations. Every six months MW-18 <br /> will be analyzed for contamination . You will be notified should <br /> any of these results indicate a problem. <br /> We are confident that our actions and plans have removed the <br /> major quantity of contamination and the threat to the existing <br /> groundwater quality and that the impact of the contamination is <br /> minimal and will remain very localized. Our monitoring program <br /> will insure this. If you have any concerns or questions <br /> regarding our program please do not hesitate to call Ron Quick at <br /> C209) 858-5151 , <br /> Very truly yours, <br /> -ems_ <br /> James A.Meyer <br /> Plant Manager <br /> Ronald Quick <br /> Technical Services Coordinator <br /> 500 East Louise 1P.O. Box 128 Lathrop,California 95330 Telephone 209 858-5151 TWX 510-762-6630 <br />