Laserfiche WebLink
�+ Work Plan for Monitor WeN�pling and Groundwater Investigation <br /> Pilkington North America <br /> May 9,2003 <br /> Page 3 <br /> Project Schedule and Reporting <br /> Condor can coordinate and conduct the.described fieldwork within four weeks of SJCEHD approval of <br /> this work plan and client notification to proceed. Standard turn-around-time for laboratory results is two <br /> weeks. Following receipt of the laboratory,results of the groundwater samples collected during the <br /> monitor well sampling and groundwater investigation, Condor will prepare and submit a draft report of <br /> the findings to PNA.The report will include a description of the fieldwork conducted, a description of the <br /> field and laboratory results of the investigation, and recommendations. A final report will be submitted to <br /> the SJCEHD following PNA review of the draft report and approval. If you have any questions or need <br /> additional information,please call us at(209)234-0518._ <br /> Respectfully submitted, <br /> CONDOR EARTH TEC 'OGTE>S;,I1VC. <br /> F. <br /> No. <br /> Donald F.Kresse t1j �� :y Je tt <br /> California Registered 9��F CAS\FRe 1st ed Civil <br /> Geologist#6430 Engineer C044265 <br /> Attachments: Figures 1,2, and 3 <br /> cc: Mr. Roger Bishop,Pilkington North America <br /> P:\3151 Pilkinton PLOF\3151J UST Review\Work Plan\3151 MWSamplingGeoprobe WP.doc <br /> il� CONDOR <br />