My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:43:45 AM
Creation date
6/25/2019 8:17:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�OITt�WShA['�3•�,.� rn*,^. ��t". SSS°..1i�.�111QS <br /> Mike Clark <br /> George Clark Drilling <br /> 2024 E. Charter Play <br /> Stockton , CA 95205 <br /> Dear Mike: <br /> Enclosed is a sketch of the LOP property showing the approx- <br /> imate locations of the 10 propcsed borings . As discussed <br /> with Renaldo Crook and yourself, we plan to advance, 3 to 4 <br /> borings to a depth of 20 ft. with the remaining 6 or 7 <br /> borings completed to a depth of 15 ft. The casing will be <br /> installed in the borings following completion and gravel <br /> packed to the top of the screened portion of the well <br /> casing ( 5 ft. below. grade ) immediately. Wells exhibit- <br /> ing the presence of product after 24 to 48 hours will be <br /> completed to the surface while the clean wells will he <br /> removed and backfilled with native material. One thing <br /> that we did not discuss is that. we would like you to <br /> provide the well pack which we would prefer to be 3/8" <br /> semi-rounded pea gravel. I estimated that we would neer. <br /> approximately 4 . 6 cubic yards. <br /> I 'c.Til1 ca11 to confirm all details sometime today. <br /> Sincerely, <br /> Marty Cramer <br />
The URL can be used to link to this page
Your browser does not support the video tag.