My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:43:45 AM
Creation date
6/25/2019 8:17:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDOR Pax:2095320773 May 14 '99 7:49 P.01 <br /> - California Ref conal Water Quality Atrol Board <br /> -' Central Valley Region <br /> Wms4on 8 ffi Stovers T.Bndtx,Chair Gray.Davis <br /> Governor <br /> SW_Wyf_ Sacramento Maio Office <br /> E&WronmvMz1 TtseatetAddrea: ht0:1vcww.swrcb.ca4ov6-twgcb5 <br /> Protamlalt 3413 Rcuturgrid,Suck A.Sa=mwto,CaVotnu 95927-3003 <br /> Phow(916)255.3000•FAX(916)255-3015 <br /> I( U�V'7 <br /> 11May1999 <br /> A�4Y 1 3 1999 <br /> Mr. Ion Weiss <br /> Libbey-Owens Ford Co. <br /> P. O.Box 128 <br /> Lathrop, CA.95330 <br /> APPROVAL OF THE PRODUCT RECOVERY SYSTEM FOR THE DIESEL LINE SPILL, <br /> LIBBEY-OWENS-FORD COMPANY, SAN 3OAQUlN COUNTY <br /> I have reviewed the 23 March 1999 addendum to the Work Plan for the Standby Generator Diesel <br /> Supply Line Product Recovery System Installation and Monitoring Well Installation for the Libbey- <br /> Owens-Ford (LOT facility in Lathrop. The addendum and work plan propose to install six product <br /> recovery wells and three monitoring wells. <br /> The work plan is hereby approved. Based on the work plan schedule,you should submit an installation <br /> report by 12 July 1999. Please inform me at least 72 hours prior to initiation of field work so that I may <br /> be present to observe or take split samples. <br /> If you have any questions,you may call me at(916) 255-3081. <br /> PHIL S. ISORENA <br /> Associate Engineer <br /> PSI-psi <br /> cc: San Joaquin County Environmental Health Division, Stockton <br /> Nle.Robert Job,Condor Earth Technologies,Inc., Sonora <br /> Post4r Fax Note 7671 <br /> r, From 7 <br /> coJDgpt. <br /> Fra. �..-.-.`..'. <br /> California Environmental Protection Agency <br /> p�.Reey4ed Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.