Laserfiche WebLink
low <br /> ' BORING ND GP-2 <br /> CONDOR EARTH TECHNOLOGIES - Geo f og i co ! Log PAGE 1 OF 1 <br /> PROJECT NO:1B38 DATE 12/3/96 <br /> PROJECT Libby-ONens-Ford Diesel Supply Line TOTAL DEPTH 15' <br /> ' LOCATION Lathrop, CA HOLE DIAMETER 2" <br /> DRILLING CONTRACTOR Vironex HAMMER WEIGHT AND FALL NIA <br /> DRILL EQUIP GeoProbe SURFACE CONDITIONS soil and glass <br /> t DRILLING METHOD Direct Push DEPTH TO STATIC WATER 11' <br /> LOGGED BY Don Kresse <br /> ' 11 ¢ VOLATILE <br /> DEPTH w� FIELD DESCRIPTION SAMPLE o; DRGnNIc REhARKS <br /> (FT) ° o 'a a VAPORS <br /> 0 U <br /> u irtrvl /IO (S o o x (PPM) <br /> J <br /> 10 YO 30-0 25 50 TS <br /> SILTY SAND dark Drawn; OVA = PID <br /> D P 1 DRILL METHODSM Fine groaned: well sorted; moist = DIRECT PUSH <br /> 2 <br /> 3 1 D no odor <br /> ' S GP2-9 <br /> S <br /> 1 7 <br /> SILTY SAND light alive: 0.0 no odor <br /> g F me grained; moist GP2-8 <br /> 9 SAND gray+sh olive, <br /> 5P Fine groaned: saturcted 1 0 no odor <br /> 1 GP2-10 <br /> 1 17 <br /> ]v <br /> jy SILT grayish olive: <br /> ' N h <br /> medium plastic 0.5 no odor <br /> 15 GP2-15 Water sample 183E-GP2-12/3/9 <br /> Berehele terninoted of 15'. collected. No odor or Free <br /> )5 Borehole backPilled with 1% product. <br /> bentonite/cement mixture <br /> }7 <br /> 19 <br /> 2u <br /> u <br /> 22 <br /> 23 <br /> 29 <br /> 25 <br /> ' 26 <br /> 27 <br /> 28 <br /> 29 <br /> 3J <br /> 32 <br /> 31 <br /> 3t <br /> 35 <br /> 1 <br />