Laserfiche WebLink
%it, <br /> FREE PRODUCT RECOVERY FIELD FORMCONDOR y14'Trimble <br /> PROJECT#: 1838 PERSONNEL: NJD 188 Frank West Circle, Suite I, Stockton, CA 95206 <br /> PROJECT ID: PNA Stammer DATE: 10/04/2013 (209)234-0518 RECOVERY METHOD(RM) <br /> DECONTAMINATION METHO Standard Procedure Alcohol/Other s eci I: Skimmer(passive or active) <br /> ( p fy): 2: SoakEasJ"'Socks <br /> (standard decontamination procedure consists of washing gea o upon of DI water and a phosphate free soap and then double rinsing with DI water) 3: Bailing <br /> 4: Other(Note Method) <br /> INITIAL DATA AND SETTINGS ONSITE FINAL DATA AND SETTINGS <br /> RECOVERY DATA <br /> WELL DATA RECOVERY DATA RECOVERY DATA VOLUME ACTIVE SKIMMER SETTINGS <br /> WELL WELL DTP DTW PRODUCT ACTIVE PRODUCT PRODUCT PRODUCT PRODUCT TOTAL ACTIVE PRODUCT NITROGEN PUMP BATTERY <br /> ID DIAM. (Feet) (Feet) LAYER SKIMMER RECOVERY VOLUME RECOVERY VOLUME VOLUME(gal) SKIMMER RECOVERY PRESSURE CYCLE/ CHANGED <br /> THICKNESS STATUS METHOD RECOVERED METHOD RECOVERED RECOVERED STATUS METHOD (TANK/LINE) RUNTIME (Yes/No) <br /> Feet On/O 1-4 Gallons (1-4) (Gallons Each Well On/ 1 -4 <br /> RW-1 4" 11.72 <br /> RW-2 4" 12.49 12.82 0.33 3 0.13 0.13 2 <br /> RW-3 4" 12.16 12.32 0.16 off 2 0.03 0.03 off 2 <br /> RW-4 4" 11.73 11.79 0.06 <br /> RW-5 4" 11.75 <br /> RW-6 4" 12.26 <br /> Initial Measurements (Drum) Final Measurements (Drum) <br /> Depth to Water: Depth to Product: 2.19 Depth to Water: Depth to Product: 2.19 <br /> DTPiemmi Note:Make sure drum is level,measure DTP rmm drum fill bung with interlace probe,and record this number:Use as much care as possible,straighten tape,etc;if the active skimmer was not on.the previous and initial current event measumments should he(be aarM. <br /> Notes/Comments: On site for weekly recovery operations. Open recovery wells to allow groundwater level to equalize. Set up decon buckets, begin collecting depth to <br /> water I depth to product measurements. Decon depth to product meter between use on each well. Collect product from SoakEase sock in RW-3 and use disposable <br /> bailer to recover a portion of free product in RW-2.Added new SoakEase sock to RW-2. Measure product in drum.Added product from recovery wells.Final drum <br /> measurements. Closed&secured wells. SoakEase sock may be needed for RW-4. <br /> X:\Projmt\l000-pq\1838 PLAF Diesel Line\1838RReports\IQ14\20131004 Free product.docx <br />