My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 10:32:35 AM
Creation date
6/25/2019 8:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
02
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CE <br /> HEAI TH <br /> =RVIGE <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> 1125 No. Golden State Blvd. 21663 Brian Lane <br /> Suite H P.O. Box 3905 <br /> October 22 , 1993 P.O. Box 3448 Sonora, CA 95370 <br /> Turlock, CA 95381 (209)532.0361 <br /> (209)668.9234 FAX (209)532-0773 <br /> FAX (209)668-9248 <br /> Mr. Phil Isorena <br /> CRWQCB - Environmental Affairs <br /> 3443 Routier Road <br /> Sacramento, CA 95827-3098 <br /> RE: Addendum to Work Plan ( 10/15/93) <br /> Libbey-Owens-Ford Co. <br /> 500 E. Louise Avenue, Lathrop, California <br /> Dear Mr. Isorena: <br /> Based upon our discussion of October 20, 1993, the following <br /> items will be addressed during the investigative phase of the <br /> work described in CONDOR's WORK PLAN - Soil and Groundwater <br /> Investigation and Remediation dated October 15, 1993 . The <br /> activities presented in the work plan and this letter addendum <br /> will begin on October 25, 1993, as per your verbal authorization. <br /> ( 1) The small-diameter (4-inch) wells will be installed <br /> prior to dewatering activities near the sump areas . <br /> (2 ) Soil samples will be collected from the hydropunch <br /> boreholes for grain-size analysis from both the vadose and <br /> saturated zones . The results of the analyses will be used <br /> for final well construction details for the small and large- <br /> diameter wells . <br /> ( 3 ) At least on selected soil sample from each sump area <br /> will be analyzed for semi-volatiles and volatiles will also <br /> be analyzed for TEPH - diesel (Method 3550/LUFT) and TPH- <br /> gasoline (Method 5030/LUFT) . <br /> (4) The groundwater samples obtained from the large- <br /> diameter (6-inch or larger) wells will also be analyzed for <br /> TEPH-diesel (Method 3510/LUFT) , TPH-gasoline (Method <br /> 5030/LUFT) , 17 priority metals (Method 6010 ) , and general <br /> minerals (CAM-Title 22 ) . <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.