My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 10:32:35 AM
Creation date
6/25/2019 8:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
02
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pany <br /> OCT 1 1 1985 <br /> ENVIROMENTAL HEALTH <br /> FERMIT/SERVICES <br /> California Regional Water October 9, 1985 <br /> Quality Control Board <br /> Central Valley Region <br /> 3201 S Street <br /> Sacramento, CA 95815 <br /> Mr . Gary Reents: <br /> Enclosed is our wastewater discharge monitoring report for the <br /> month of September , 1985. Included is other environmentaly <br /> related information that may be of interest to some on the <br /> expanded distribution list . <br /> The August Cobalt and Chromium analyses were received late and <br /> both were less than 0 . 05 mg/l . With the exception of coliform <br /> the other, analyses were well within our permit limitations. <br /> Our heavy chlorination after the September 2nd high value for <br /> coliform helped somewhat but tontines intermitt.antly high . The <br /> first value for October was 98 MPN1100ml . We have since <br /> discovered missing chlorination basin dividers in our sanitary <br /> treatment plantwhich would have severely decreased the chlorine <br /> contact time. This could well have been the problem all aIonq <br /> rather than the sludge residing at the bottom of our, reservoir . <br /> New dividers were instal fed and we have resumed sludge wasting <br /> on a regular basis. This material is being hauled to a municipal <br /> sanitary facility by Roto-Rooter . We are increasing our <br /> analytical effort on our sanitary plant as well increasing our <br /> reservoir coliform analyses to once per week until we feel this <br /> problem is .under. control <br /> Thru September 30 1 <br /> we have extracted 5374 gallons of oil from our <br /> leak of autoclave oil on Jan 24th . The flow of oil into the <br /> extraction pit is slowing but we feel some months of pumping <br /> still remain before the site is adequately renewed. The analyses <br /> requested on .- the suspect monitoring wells were completed and <br /> are enclosed.' No volatile halogenated comppunds were detected. <br /> With regard to the contaminated dirt removed from the spill site <br /> we asked our, consultant to study the feasiblity of land spreading <br /> it as you have suggested might be possible. Their report is <br /> enclosed. We request we be allowed to spread this material as <br /> they have suggested in an area immediately east of our batch <br /> silos. We plan also to remove more dirt from the spill site <br /> after the clean-up is completed and add it to this spreading <br /> site. <br /> 500 East Louise Lathrop,California 95330 Telephone 209 858-5151 TWX 510-762-6630 <br />
The URL can be used to link to this page
Your browser does not support the video tag.