My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 10:32:35 AM
Creation date
6/25/2019 8:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
02
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E ' <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> February 9, 1999 1125 N.Golden State Blvd. 188 Frank West Circle <br /> Suite G Suite I <br /> Turlock, CA 95381 Stockton, CA 95206 <br /> (209) 668-9234 (209) 234-0518 <br /> Mr. Philip Isorena FAX(209) 668-9248 FAX(209) 234-0538 <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3003 <br /> RE: Proposed Modifications to Scope of Work in Approved Work Plan(dated June 23, <br /> 1997) and Addendum to Work Plan(dated May 11, 1998) for Standby Generator <br /> Diesel Supply Line Product Recovery System Installation and Monitor Well <br /> Installation,Pilkington Libbey Owens Ford,500 East Louise Avenue,Lathrop, <br /> California,San Joaquin County <br /> Dear Mr. Isorena: <br /> Introduction <br /> Pilkington Libbey Owens Ford(LOF)has been communicating with you regarding the discovery of,and <br /> responses to the discovery of,diesel fuel in soil and groundwater near an above ground fuel storage tank <br /> (AST)at the LOF site in Lathrop,CA. The AST supplied diesel fuel to a backup generator at the facility. <br /> A leak in an underground fuel pipeline associated with the AST was discovered in July 1996. In December <br /> 1998,LOF attempted to perform work that was approved by your department(correspondence dated June <br /> 16, 1998)to remove free-phase diesel, if present,by installing a series of gravel-filled trenches and a <br /> skimmer pump. Installation of the trenches,though attempted,was not possible due to the concentration of <br /> underground utilities and soil instability in the area of the proposed trenches. Approximately 50 lineal feet <br /> of trench was excavated at different times and locations in the area. Trenching was performed in areas with <br /> the lowest density of underground utilities;however,four different pipelines were exposed during the <br /> trenching. All trench walls failed before the bottoms of the trenches could be inspected for an <br /> accumulation of diesel and before gravel backfill could be placed. <br /> As a result of the difficulties encountered during attempts to install recovery trenches,further attempts to <br /> recover free-phase diesel from the site are not proposed at this time. Recovery of free-phase diesel, if <br /> present, is not proposed for the following reasons: <br /> 1. The source of the diesel release has been eliminated. The AST is now used for vehicle fueling only. <br /> The underground fuel pipeline that leaked is no longer in use. A new diesel AST was installed near the <br /> standby generator. <br /> 2. Recovery trench installation is not feasible using traditional excavation methods due to soil instability. <br /> 3_ Any type of trenching or excavation is not feasible without costly underground utility relocation, <br /> especially gravity drain sewer and stormwater pipelines. <br /> 4. A nearly flat groundwater gradient is anticipated based upon review of previous groundwater <br /> monitoring performed at the LOF site. Movement of the diesel plume is not expected to be <br /> significantly influenced by groundwater flow. <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br /> hftp:Nwww.condorearth.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.