Laserfiche WebLink
• • Soil Investigation Work Plan <br /> Pilkington North America,Inc. <br /> October 27,2010 <br /> Page 5 <br /> inspect the piping system and ASTs, and conduct pressure testing of the diesel delivery system if <br /> ' recommended by the inspector. <br /> 5.0 REPORTING <br /> ' Condor will prepare a report detailing the findings of the investigation to be submitted to the Regional <br /> Water Board and the SJCEHD. The report will include a discussion of the field and laboratory <br /> procedures used to conduct the investigation, a discussion and presentation of the analytical results, and <br /> ' recommendations. <br /> 6.0 PROJECT SCHEDULE <br /> ' Upon approval of this work plan by the Regional Water Board and SJCEHD, and notification by the Site <br /> to proceed, Condor can begin implementation of this Work Plan. It is anticipated that the fieldwork will <br /> ' require one to two days to complete. A report can be submitted to the Regional Water Board and <br /> SJCEHD within eight weeks of receipt of the finalized laboratory analytical results. If you need <br /> additional information or have any questions, please call Casey Kipf at(209)234-0518. <br /> ' Respectfully submitted, y`Ot4AL C, <br /> g FO <br /> CONDOR EARTH' TECHNOLOGIES, INC. 4F' <�o CASEY <br /> IL KiPP `"+ <br /> No. 8271 <br /> O <br /> Micheline A. Doyle Kipf,P.G. Casey ipf,P.G. <br /> Senior Environmental Specialist Senior Geologist <br /> t <br /> ' PAI000yrj\1838 PLOF Diesel Line\l838F\Reports\Work Plan\1838F Sod Inv Work Plan 20101027.doe <br /> A <br /> J CONDOR <br /> i <br />