Laserfiche WebLink
Libbe Owens Ford Co. <br /> Product Rocavm•System Installation <br /> June 23, 1997 <br /> Page-11- <br /> 5.0 SCHEMLE <br /> The fieldwork is tentatively scheduled for August, 1997, pending the PHS/EHD review and <br /> approval of this work plan. The system installation is expected to take approximately 5 days. The <br /> monitor well installation is anticipated to be completed in one (1) day. If there are any questions, <br /> please call Jon Weiss, LOF Environmental Coordinator, at (209) 858-6202. <br /> Respectfully submitted, <br /> / ED 6F�lo% - <br /> c <br /> (� JAMES F.WACK <br /> N0.6647 * 0 <br /> James Wack ,�, Robert J. Job, P.E. <br /> State of California �9l P�\P California Registered <br /> ) 6gistered Geologist FOF CAO" Professional Engineer, Civil <br /> 6647 951592 <br /> LOF-LEITERS\LOFPRODIVPP <br /> �� CONDOR <br />