My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0506293
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 1:04:43 PM
Creation date
6/25/2019 8:55:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506293
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0016365
FACILITY_NAME
PILKINGTON NORTH AMERICA, INC
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
500 E LOUISE AVE LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 May 2019 Advanced <br /> AGE Project No. 14-3154 E n v i ro n m e n to l <br /> Page 3 of 7 <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection <br /> have been designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Boring, Well, and A B C D Other <br /> Excavation Area <br /> Reduction Zone Preserve samples A B C D Other <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator (if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate <br /> canister for use with the involved substances and concentrations. No down-grading <br /> changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Brian Millman / Daniel.Villanueva Oversee and direct <br /> operations/investigations, collect samples <br /> FIELD CREW: TASK: <br /> TBA: TBA: <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite <br /> work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.