My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2900 - Site Mitigation Program
>
PR0543804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 2:12:36 PM
Creation date
6/28/2019 1:21:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543804
PE
2950
FACILITY_ID
FA0024907
FACILITY_NAME
7-ELEVEN STORE #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Workplan for Additional Assessment and Feasibility Testing 4 <br /> 7-Eleven,Inc.Store No.20632,4627 DaVinci Drive,Stockton,CA October 17,2001 <br /> i <br /> Groundwater samples from each new well will be analyzed by a State-certified.analytical.laboratory for <br /> BTEX and TPH-G by EPA methods 8020/8015 modified, and the oxygenates, TBA, MTBE, DIPE, ETRE, <br /> i <br /> TAME by EPA Method 8260. <br /> Schedule/Report <br /> Drilling will commence within 6 months of receipt of written approval of this workplan, pending permit <br /> approval. Report preparation will be completed within 6-8 weeks of well installation. <br /> WORKPLAN FOR PROPOSED INITIAL FEASIBILITY TESTING <br /> Soil Vapor Extraction Testing <br /> Soil vapor extraction (SVE)can be used to remove the soil source of the dissolved hydrocarbon plume <br /> and supply additional oxygen to the subsurface to enhance intrinsic biodegradation,with the anticipated <br /> goal of reduction of dissolved gasoline constituents. <br /> Compared with other gasoline constituents, MTBE:is both more hydrophilic and adsorbs much less. <br /> These properties result in decreased extraction potential in moist soils, but increased vapor mobility in dry . <br /> soils. Given the site's current active status, and the relative low cost of vapor extraction as.a remediation <br /> technique, it is considered prudent to test the site for venting capability. <br /> The extraction test will be performed by applying a.vacuum to wells MW-4R and MW-2 on an individual, <br /> basis using a mobile 150-cubic feet per minute (cfm)thermal oxidizer. During the test, extracted air will be <br /> channeled to the unit after passing through a moisture knockout device and an air filter. Soil vapors will <br /> then be treated by passing them through the unit prior to discharge to the atmosphere. Observation wells <br /> (all wells not undergoing extraction)will be fitted with caps and Magnehelic gauges to monitor vacuum <br /> pressure changes during the test. Extracted vapor concentrations will be measured using a photo-or <br /> flame-ionization detector. Samples of extracted vapors will also be collected from each test well into j <br /> Tedlar bags or SUMMA canisters, for laboratory analysis and permitting purposes.. <br /> i <br /> I <br /> i <br /> 20632SAW.DOC <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.