Laserfiche WebLink
I <br /> Second Quarter 2002 Monitoring, Sampling, and Interim Remediation Report 3 <br /> 7-Eleven, Inc Store No 20632 4627 DaVinci Drive Stockton,CA July 25,2002 <br /> Monitoring Well Sampling and Analytical Results <br /> Quarterly groundwater samples were collected after purging at least four well-casing volumes of <br /> groundwater from each monitoring well, unless the well was purged dry Prior to purging, dissolved <br /> oxygen (DO) levels were recorded in each well Groundwater samples were collected using disposable <br /> bailers Samples were placed in analysis-specific containers with analysis-specific preservative The <br /> samples were then sealed using Teflon septum caps, labeled with the fob identification number, and the <br /> sample number, date, time, and type of laboratory analysis required The samples were stored on ice and <br /> transported with a chain-of-custody record to a state-certified laboratory for analysis Groundwater <br /> samples were analyzed for BTEX and TPH-G using Environmental Protection Agency (EPA) methods <br /> 8021 B/modified 8015, and for oxygenates MTBE, TBA, DIPS, ETBE, and TAME using EPA method <br /> 82606 <br /> Dissolved benzene was detected at relatively low levels in two wells (MW-4R [320 micrograms per liter <br /> {dig/L)] and MW--5 [20 pg/L]) Dissolved MTBE was detected in all wells at concentrations ranging from <br /> 1 1 pg/L in well MW-6 to 22,000 pg/L in well MW-7 Quarterly and historical analytical results for <br /> groundwater samples are summarized in Tables 1 and 1A, respectively (Attachment 2) Selected dissolved <br /> constituents are plotted on Figure 2 Laboratory analytical reports are included in Attachment 4 <br /> Dissolved oxygen (DO) levels ranged from 0 8 milligrams per liter(mg/L) in well MW-1 to near 6 mg/L in the <br /> Faillah three new monitoring wells, indicating anaerobic (less than 2 0 mg/L) to aerobic conditions <br /> Furthest(new) downgradient well MW-7 contains 22,000 pg/L MTBE, additional lateral plume delineation is <br /> needed, and access requirements to install another well further downgradient are currently under <br /> l J negotiation with offsite private property owners New well installation is scheduled for third quarter 2002 <br /> pending successful access <br /> Purgewater Transportation and Disposal <br /> All purgewater generated during this quarterly monitoring and sampling event was stored onsite in <br /> 55-gallon Department of Transportation (DOT)-approved drums, pending characterization and proper <br /> Ddisposal at a licensed recycling facility Waste disposal documentation will be forwarded if requested <br /> aConclusion and Recommendations <br /> Additional delineation is recommended to proceed as soon as possible, followed by submittal of <br /> a recommendations for remedial action Site remediation (at least in the source area and/or within site <br /> boundaries) is recommended to commence by the start of early fourth quarter 2002 <br /> 20632Q22 QMR DOC <br />