My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003328
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2900 - Site Mitigation Program
>
PR0543804
>
ARCHIVED REPORTS XR0003328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2019 3:32:29 PM
Creation date
6/28/2019 2:37:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003328
RECORD_ID
PR0543804
PE
2950
FACILITY_ID
FA0024907
FACILITY_NAME
7-ELEVEN STORE #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORC TECHNICAL BULLETIN # IL1 <br /> Oxygen Release Compound, ORC® <br /> Cost Comparison <br /> Mechanical Treatment Methods <br /> Assumptions: <br /> 10 ppm dissolved phase BTEX Plume width of 80 ft with seepage velocity of 3 ft/day <br /> 8 feet to groundwater and 12 foot contaminated saturated zone No floating product <br /> Oxygen Carbon Ratio = 3 1 <br /> The site is assumed to be developed with roads, sewers, and already installed 220 volt/3 phase power available at no <br /> additional cost for installations, permits,electrical distribution,or equipment(for those treatment methods requiring sewer <br /> or electricity) In addition, it is assumed that no buildings or general area fencing are required,but above-ground process <br /> equipment is fenced <br /> Special testing necessitated by the nature of the treatment and routine BTEX analysis are included Additional standard <br /> monitoring costs for the site are excluded, since they are assumed to be site specific and determined by local regulatory <br /> agencies (Note that no testing of off gases from air sparging is provided in the estimates) <br /> DRC Oxygen Barrier Fust Year Subsequent Years <br /> Installation $45,000 $0 <br /> • Annual Operating Cost 24,000 18,000 <br /> Total $69,000 $18,000 <br /> Pump-and Treal - <br /> Installation $132,000 $0 <br /> Annual Operating Cost 94,000 36,000 <br /> Total $226,000 536,000 <br /> Au-Spargaig Barrier with SVE <br /> Installation $127,000* $0 <br /> Annual Operating Cost $29,000 $29,000 <br /> Total 5156,000 529,000 <br /> Air-Spargrng Barrier without SVE(If permissible) <br /> Installation $61,000' s0 <br /> Annual Operating Cost 14,000 14,000 <br /> Total 575,000 514,000 <br /> *Plus cost of pilot test,if necessary Experts often advise against implementing an air spargmg treatment without a field <br /> pilot test which typically costs $10,000 to$30,000 Many reputable consulting firms refuse to install air sparging systems <br /> without pilot testing due to the importance of site-to-site variability in system performance and third party liability concerns <br /> REGENESIS ----------------------------------------------------------------------------------------------- <br /> Blorertledletion ProdUCtS 27130A Paseo Espada, Ste 1407, San Juan Capistrano, CA 92675 <br /> Phone 714-443-3136 Fax 714-443-3140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.